How to install and debug the briquetting machine?

- Oct 18, 2019-

How to install and debug the briquetting machine?

Many customers will consider many problems (Emerson) before purchasing the briquetting machine. I am worried about this worry. For example, how to install and debug the briquetting machine, the customer does not understand the equipment, so that you can worry less when purchasing. , Xiaobian for you (Introduction).

I can tell you very responsibly that all purchases (buy) our company briquetting machine provides installation (ān zhuāng) commissioning service, and does not charge any fees (expense). Our steps to install and debug are as follows:

1. The foundation should be made in advance. After the briquetting machine is transported, it should be directly hoisted to the foundation. The parallelism of the plane of the workbench to the base plane should be less than 0.15/1000mm, and then tightened with screws.

2. Familiar with technical data and preparation tools, hydraulic system schematics, electrical schematics, etc. should be prepared so that engineers and technicians can familiarize themselves with the specific content and technical requirements, and install (ān zhuāng) process (guò chéng) The installation tools, wires, etc. to be obtained should be prepared;

3. Install the oil pipe, pump station and control cabinet according to the drawings provided by the manufacturer.

4. After the machine is installed (ān zhuāng), clean the oil tank and inject the filtered clean hydraulic oil into the fuel tank. The oil injection amount should be more than 2/3 of the oil scale showing the oil quantity.

3. Turn on the external power supply, start the motor after connecting, observe that the steering of the motor should be consistent with the running direction specified by the oil pump (Deep well pump).

5. When the equipment runs smoothly and without noise, it can be debugged by the test machine. The debugging is first manually debugged, and then manually adjusted to adjust to automatic operation control. The specific procedure is as follows:

Move the automatic nickname air circuit breaker to the ON position and the power indicator light is on.

Adjust the operation mode to the manual position, press the power supply (device that supplies power to the electronic device) switch, the motor starts, wait for the motor and the oil pump to idle for five minutes, observe whether the oil pump motor unit is running normally, and check the machine without any abnormality.

Press the up button to move the punch up and reach the upper limit position.

Press the down button, move the punch down and slowly enter the mold, press molding and adjust the pressure until the pressure is right.

6. After the manual test machine is completed, adjust the button to the automatic mode and start automatic pressing. After 2-3 days of running-in, the system and the mold are used stably, and the equipment can be delivered. The waste paper baler is used to extrude waste paper and similar products under normal conditions, and is packaged and formed by special packaging belts, so that the volume thereof is greatly reduced, thereby reducing the transportation volume, saving freight, and increasing the efficiency for the enterprise. Introduced advanced technology and advanced technology of similar products at home and abroad.